| Working in conjunction with
some of the premier upfitters in the country SuperSprings International
Inc. has designed and developed applications to suit their customer’s
specifications. Eccentric load placement in the commercial upfit market
has traditionally required OE spring packs being modified off-site. Down
time and lack of adjustability have always been costly limitations to
this approach. With SuperSprings each of these factors has been overcome.
SuperSprings easily installed on-site, the entire job typically taking
between 15 and 60 minutes to complete. The variety of shackle options
available allows installers to set the SuperSprings according to their
particular specifications. The reduction in time, labor and transportation
per vehicle translates into significant cost savings for the installer
and ultimately for the customer.
|